Jade Stone Engineering performed a retro-commissioning project for the existing fire station to help improve comfort complaints and increase energy efficiency. A detailed site survey was implemented to discover current occupant complaints and observe any mechanical and electrical equipment issues.
After the survey was complete, JSE provided a detailed list of options with potential paybacks to determine which items were going to be improved.
Services included full design documents, specifications and construction administration to complete the work. Work performed included re-piping of the existing heating system, the addition of high-efficient pumps, and reworking of the existing control system.
Heat piping modifications
New high-efficient pumps
Modifications to control system