Fort Drum – Hays Hall Headquarters

jadestone-engineering-Fort Drum-Hays Hall

Administration Space HVAC Renovations

Improvements to the first and second floors of the Hays Hall Headquarters building included two (2) central 26,000 cfm air handler units with plenum fans, and a 100-ton air-cooled chiller with water economizer coil.

 

Work also included generator upgrades, switchgear modifications, and extensive branch circuit wiring to accommodate the mechanical equipment modifications/additions.

 

This project required close coordination with the building occupants.  A detailed phasing plan was prepared for the project to allow for continued use of the facility during the construction period.

 

 