Improvements to the first and second floors of the Hays Hall Headquarters building included two (2) central 26,000 cfm air handler units with plenum fans, and a 100-ton air-cooled chiller with water economizer coil.
Work also included generator upgrades, switchgear modifications, and extensive branch circuit wiring to accommodate the mechanical equipment modifications/additions.
This project required close coordination with the building occupants. A detailed phasing plan was prepared for the project to allow for continued use of the facility during the construction period.