The purpose of this project was to eliminate the groundwater intrusion into the basement of P-10000 (Hays Hall – Ft. Drum Headquarters Building) via the installation of (8)10HP sub-surface de-watering pumps. Jade Stone Engineering provided all of the MEP engineering for this project for the Gov’t as part of the Structural Associates (SAI) design-build team.
(2) new 550kW natural gas fired generators
750kVA pad mounted Transformer
Gas and Electrical Design work
Coordination with Trane for the pump control package design and interface
Specification of the water pump Motor Control Center
New service entrance electrical gear
Underground power and control piping