Fort Drum Headquarters Building – Dewatering Project

jadestone-engineering-project-image

De-Watering Equipment

The purpose of this project was to eliminate the groundwater intrusion into the basement of P-10000 (Hays Hall – Ft. Drum Headquarters Building) via the installation of (8)10HP sub-surface de-watering pumps. Jade Stone Engineering provided all of the MEP engineering for this project for the Gov’t as part of the Structural Associates (SAI) design-build team.

(2) new 550kW natural gas fired generators

750kVA pad mounted Transformer

Gas and Electrical Design work

Coordination with Trane for the pump control package design and interface

Specification of the water pump Motor Control Center

New service entrance electrical gear

Underground power and control piping

Jade Stone Engineering