JSE worked with the Army Corps of Engineers to perform a retro-commissioning project involving Range 1 Firing Range.
Post Construction evaluation & retro commissioning of Firing Range.
After occupying the new firing range, the Government experienced laminar air flow velocity issues. JSE assisted the Government with an on-site evaluation of the HVAC system and designed a solution that was necessary to meet the minimum recommended air flow velocities across the shooting line.
© 2020 Jade Stone Engineering. All Rights Reserved. | Privacy Policy