NYS OGS – Greenhaven Correctional Facility Water Plant Improvements Project

jadestone-engineering-project-image

Correctional Facility Water Plant Improvements

Jade Stone Engineering has partnered with BCA Architects & Engineers to replace the existing water controls system with a new PLC-based system at Greenhaven Correctional Facility in Stormville, NY. The approach taken is to provide a main control panel (MCP) located at the Water Treatment Facility (WTF), Booster Pump Control Panel (BPCP), and alarm/monitoring panel located at the Power-House. The new main control panel will provide control/monitoring of the overall water system. A new booster pump control panel will administer control/monitoring of the water system. A new alarm/monitoring panel will monitor the overall water system. Spread spectrum wireless radios are proposed for all locations to allow wireless communications between the WTF, BPS, and Power-House. As part of this project all programming services, integration services, and screen development services will be provided to place in operation a complete and functional control system. A Windows based tablet for remotely accessing and controlling the system via the internet has also been proposed for the project.

New Microfiltration Membranes

Replacement of Water Softening Equipment

New Master Control Panel and SCADA System

Replacement of 2 Backwash Recovery Pumps

Control Riser Diagrams

Electrical Single Line Diagrams

Wireless Radio Integration

System Controls via Internet

Jade Stone Engineering