jadestone-engineering-JSE-logo-edited(light)
  • Home
  • Our Firm
    • Our Firm
    • Our Team
    • JSE Aircraft
    • Careers at JSE
    • Community
  • Services
    jade-stone-engineering-mechanical-icon
    Mechanical Engineering
    Mechanical Engineering for Facilities.
    jade-stone-engineering-electrical-icon
    Electrical Engineering
    Electrical Engineering for Facilities, Infrastructure and Distribution Design.
    jade-stone-engineering-plumbing-design-icon
    Plumbing Design
    Plumbing Engineering for Facilities and Infrastructure.
    View All Services
    View All Services
  • Projects

    Commercial

    Education

    Government

    Healthcare

    Industrial

    Municipal

    Water/Wastewater

    View All Projects
    View All Projects
  • News & Views
  • Contact
jadestone-engineering-JSE-logo-edited(light)
jadestone-engineering-JSE-logo-icon
  • Home
  • Our Firm
    • Our Firm
    • Our Team
    • JSE Aircraft
    • Careers at JSE
    • Community
  • Services
    jade-stone-engineering-mechanical-icon
    Mechanical Engineering
    Mechanical Engineering for Facilities.
    jade-stone-engineering-electrical-icon
    Electrical Engineering
    Electrical Engineering for Facilities, Infrastructure and Distribution Design.
    jade-stone-engineering-plumbing-design-icon
    Plumbing Design
    Plumbing Engineering for Facilities and Infrastructure.
    View All Services
    View All Services
  • Projects

    Commercial

    Education

    Government

    Healthcare

    Industrial

    Municipal

    Water/Wastewater

    View All Projects
    View All Projects
  • News & Views
  • Contact
Back to Projects

OGS Capital District Psychiatric Center HVAC Replacement

  • Albany, New York
Government
jadestone-engineering-project-image

HVAC Replacement

JSE assisted OGS and Sage Engineering Associates with the replacement of HVAC systems at the Capital District Psychiatric Center. Overall project requirements, included but were not limited to, the replacement of large air handling units, return fans, and freeze protection pumps. Close coordination was necessary between trades for space constraints and sequencing requirements. Fire alarm system modifications were designed to accommodate duct work alterations and associated duct smoke detector locations.

 

Project Challenges included locating existing power sources large enough and with enough spare ampacity to serve such large Air Handling Units.

Extensive Field Investigation

Electrical Branch Circuit Design

Coordination with OGS and HVAC Designer

Fire Alarm System Modifications

jadestone-engineering-project-image
jadestone-engineering-project-image
jadestone-engineering-project-image
PrevDevelopment Authority of the North Country Emergency Generator Project
OGS – Mohawk Upgrade Generator and SwitchgearNext
Instagram
Linkedin
Facebook
Youtube
Contact
  • 315.836.4062
  • [email protected]
  • 444 Vanduzee St. Watertown, NY 13601
Firm
  • Who We Are
  • Our Team
  • JSE Aircraft
  • JSE Experience
  • Careers
Menu
  • Who We Are
  • Our Team
  • JSE Aircraft
  • JSE Experience
  • Careers
Services
  • Mechanical Engineering
  • Electrical Engineering
  • Plumbing Design
Menu
  • Mechanical Engineering
  • Electrical Engineering
  • Plumbing Design
Projects
  • Commercial
  • Education
  • Government
  • Healthcare
  • Municipal
  • Water/Wastewater
Menu
  • Commercial
  • Education
  • Government
  • Healthcare
  • Municipal
  • Water/Wastewater
© 2020 Jade Stone Engineering. All Rights Reserved. | Privacy Policy | Created by Williams Media