JSE was the Electrical Project Engineer for the design of a new 30’ x 60’ DMNA SCIF within the existing Troy Armory Facility. The SCIF consisted of a conference room, dedicated data room, dedicated electrical room and a central collaboration area.
On site extensive measuring and analysis of the existing electrical and generator system loads.
Extensive main electrical gear replacement, to include phasing provisions.
Design of Red and dedicated Black electrical system that met the SCIF UFC requirements.
A fiber optic fire alarm
TEMPEST requirements
© 2020 Jade Stone Engineering. All Rights Reserved. | Privacy Policy