The existing Parish Public Library underwent a 1,680 square foot Addition and Renovations project. The Addition includes programming space, additional space for collections, as well as a community meeting room. The addition also makes the Library fully handicap accessible. With the existing building’s historic structure, a great amount of coordination and care was required on this project.
JSE was the lead mechanical, plumbing and electrical engineers on the project. Scope of work included new gas-fired furnaces along with cabinet heaters to supplement the heating system, new air cooled condensing units to provide cooling, new domestic water and sanitary plumbing throughout, new plumbing fixtures, new high efficiency LED lighting, general power and data distribution, extension of the fire alarm system and replacement of the overhead electric triplex service conductors.