Jade Stone Engineering provided the design for a renovation and addition to the existing South Jefferson Rescue Center building. The renovation consisted of 8,000 SF of new and existing space which entailed ambulance parking bays, locker rooms, office spaces, sleeping quarters and conference rooms.
Work included detailed preliminary designs to go over potential systems, a vehicle exhaust system, three (3) decentralized constant volume AHU’s and one (1) RTU, new plumbing throughout the building, trench drains, and an oil water separator.
Vehicle exhaust system
Three (3) decentralized constant volume AHU’s and one (1) RTU
New plumbing throughout the building
Trench drains
Oil water separator
(1) RTU
© 2020 Jade Stone Engineering. All Rights Reserved. | Privacy Policy