JSE worked with the Village Engineer to design the electrical systems for the Village of Dolgeville Wastewater Treatment Plant Improvements Project.
New electrical gear lineup within the influent building.
New electrical systems (power and control) associated with the new sludge pumping system.
Influent pumping system and grit system.
Pump controls were designed/specified for all new pumps and VFDs were specified along with a main control panel.
The control system controls all pumps automatically based upon select instrument inputs.
Design was provided to include spare/empty raceway for controls in anticipation of a future supervisory control and data acquisition (SCADA) system.
A temporary power plan was also developed and implemented to ensure the WWTP remained operational during the electrical gear upgrades.